Hospital São Luiz: ward refurbishment

Rooms divided with plasterboard walls insulated with rock wool and cement board walls in the bathrooms, asphalt membrane waterproofing and porcelain tiles on walls and floors. Plasterboard ceilings, doors, aluminium windows and hopper vents, electrical points, LED lighting, relocated split air-conditioners and satin acrylic paint. Also includes renovation of consulting room 3.

Client
Hospital São Luiz (Grupo Kora Saúde)
Location
Ibes, Vila Velha
Dates
May 2021 - Aug 2021
Status
Completed
Quantities and quality control
ItemUnitQuantity
Satin acrylic wall paint (masonry/plaster), item 3.6m²174.98
Satin acrylic wall paint, item 5.18 (second block)m²174.98
Ceiling painting (bedroom and bathroom)m²68.75
White Plain Lux porcelain tile 30x60 (bathroom walls)m²95.33
Rectified porcelain tile 60x60 (bathroom floors)m²11.46
Bianco Plus porcelain tile 80x80 (bedroom)m²20
Waterproofing with 4 mm bituminous membrane (bathrooms)m²30
Complete bathrooms builtund5

Source: the project's progress reports.